These are the Day 1 pictures and the completion pictures that Joe got from a job that we just finished. The shingle is a 30 Year Malarkey Highlander in the Black Oak color. Lot’s of great pictures from this job.
These are 2 days of pictures from a job that we did in SE Portland. We tore off the old roofing and installed a 30 Year Malarkey Highlander shingle in the Sienna Blend Color. Lot’s of great pictures from this job.
These are the pictures that Joe got from the job that we started yesterday. The house is a 3 layer tear-off and a CDX Re-sheet. Lot’s of great pictures from this roofing job.
These are the during and after pictures from a job that we just finished in SE Portland. The guys got this job done in 2 days. There was no dry-rot on this house. Lot’s of great pictures from this job.
These are the before, during, and after pictures from a roofing job that we did in Gresham. The Customer wanted us to add a skylight to his roof and it looks awesome! There was a fair amount of dry-rot replacement on this job. I think we have another dramatic transformation on our hands!
These are the pictures that Joe got from the flat roof today. We should be finished up with this job today.
These are the first 2 days worth of pictures of a flat roof that we are working on. This is a Hot Tar roof that has a taper system and a layer of insulation, then a 2nd flat roof. There was a leak and if flooded the bottom flat roof. When all is said and [...]
These are the pictures from a small entryway that we did. It was a Flat roof that had started to leak. We tore out the old and installed the new.
These are 2 days worth of pictures from a job that we did in Gresham. The shingle is a 30 Year Malarkey Highlander in the Antique Brown Color. We tore off the existing roof. Then we replaced some dryrot. The whole job took 2 days. Lot’s of great pictures from this job.
These are the pictures that Joe got from the 2nd day of the roofing job that we are doing. The shingle is a 30 Year CertainTeed Landmark in the Georgetown Grey color. There was about 300 feet of 1×8 that we had to replace, but for the most part the decking was in good shape.